Equipment
Field-ready equipment for demanding well operations
Our equipment portfolio supports drilling, wellsite monitoring, solids control, cementing and well intervention.
Drilling rig
Streicher SVR 150/180
A self-erecting, modular rig originally rated at 150 tonnes and upgraded to 180 tonnes. It features a top drive system, rack-and-pinion hoisting and a semi-automated HTV pipe-handling system.
The operator’s cabin includes joystick and push-button operation, HMI monitoring, operational parameter monitoring and remote maintenance capability. The hydraulic power unit is based on a Caterpillar C27 engine, with redundant pumps and controls.
Rig specifications
Key performance and operating data
Built for demanding well operations.
Originally rated at 150 tonnes and upgraded to 180 tonnes.
01 / UNDERGROUND
Understand the well
Review geological conditions, well design, pressure and temperature expectations, existing infrastructure and project objectives.
02 / ENGINEERING
Design for the application
Match technical choices to the available resources, site constraints, energy demand, economic goals and relevant requirements.
03 / FIELD DELIVERY
Coordinate execution
Bring the right well services, equipment and field support together through the drilling and intervention phases.
04 / LONG-TERM
Support performance
Help clients develop production, pumping and surface systems intended for reliable, long-term operation.
Start a conversation
Let’s discuss your geothermal project
Share your project requirements with the team.
